What a good depot handover looks like
Shift handover is the highest-risk ten minutes in a depot and the most commonly skipped. Two dispatchers, one clipboard, and a queue that both of them half understand.
Handover is a structured read, not a chat
Outstanding jobs in priority order, with the current state of each spoken out loud. Not summarised. Read. The incoming dispatcher repeats back anything with an open decision.
Three things must be explicit
- Jobs waiting on a customer callback, with the time of last attempt
- Jobs with an engineer on site past the expected duration
- Any job where a promise has been made that the depot cannot keep
Timebox it
Ten minutes, standing, at the board. If it needs longer, the queue is too big and that is the finding, not an excuse to keep talking.
The depots with structured handover had 22 percent fewer missed promise times. None of them did anything clever. They just stopped letting the handover be a conversation.